Prefer reading? The same steps are written out below the video.
A half-circle progress chart, like a speedometer, that shows how much of a job is done. The example tracks a task called Feedback request: 100 tasks in total, 80 completed and 20 remaining.
Put the total (100), completed (80) and remaining (20) in C3:E3. In F3, work out the progress:
=D3/C3
Format it as a percentage: 80%.
Select C3:E3, go to Insert > Pie or Doughnut > Doughnut. You get three slices: total, completed and remaining. The trick: the total slice is always exactly half the ring.
Double-click the total slice and open Format Data Point. Set Angle of first slice to 90°, so the total slice moves to the bottom half. With it selected, go to Format > Shape Fill > No Fill and Shape Outline > No Outline. Now only the top half shows.
Select the whole chart and set its Shape Fill and Shape Outline to none too. Delete the legend and change the title to Progress chart in bold black.
Double-click the completed slice and fill it dark green. Fill the remaining slice light green. Set the outline of both to No Outline to remove the white gaps.
Select the chart first, so the text boxes go inside it and move with it. Go to Insert > Text Box, type 0%, remove its fill and outline, and place it at the left end of the arc. Copy it, change it to 100% and place it at the right end.
Paste another copy, make it bigger and put it in the centre. With it selected, type = in the formula bar, click F3 and press Enter. The label now shows the progress and updates when the numbers change. Make the font black.
Select each slice and add Shape Effects > Bevel > Slant for depth. Set the doughnut hole size to about 60%. Change the completed number and watch the chart and the percentage move.
My Excel Charts, Infographics & Data Visualisation course teaches 20+ advanced charts like this from a blank sheet.
WATCHING ON YOUTUBE?
11 step-by-step courses on Excel, Power BI, Python and AI, all on Udemy with lifetime access.